A Practical Guide to Subdivision and Platting in Brentwood
Subdivision and platting matters in Brentwood touch on land use, municipal requirements, and long-term property value. Whether you are a property owner, developer, or investor, understanding local rules in Williamson County and the City of Brentwood helps avoid costly delays and design changes. Jay Johnson Law Firm provides clear guidance about preliminary plats, approval timelines, easement considerations, and recording requirements so clients know what to expect. This introduction outlines the key steps and common issues encountered during a subdivision project and prepares you to take informed next steps with confidence.
This page focuses on the practical legal considerations relevant to subdividing property and preparing plats in Brentwood, Tennessee. It explains how municipal zoning, county regulations, and survey standards interact, and how to anticipate requirements from planning commissions and public works departments. We describe common timelines and documentation expectations so landowners have realistic planning information. If you are considering dividing property or formalizing lot lines, these overview points will help you identify tasks to address early, avoid unnecessary expense, and achieve a smoother approval and recording process.
Why Subdivision and Platting Guidance Matters in Brentwood
Sound legal guidance for subdivision and platting helps preserve property value, secure necessary municipal approvals, and reduce the risk of future boundary disputes. Early attention to survey accuracy, easements, access, and infrastructure requirements allows projects to proceed without last-minute redesigns that can add cost and time. For property owners in Brentwood, understanding platting procedures and recordation obligations supports successful transactions, whether selling newly created lots or financing development. Thoughtful planning and clear documentation protect both short- and long-term interests and facilitate working with planners, engineers, and county officials throughout the process.
About Jay Johnson Law Firm and Our Approach to Land Use Matters
Jay Johnson Law Firm assists clients across Tennessee with real estate matters including subdivision and platting issues. We focus on careful preparation of legal documents, clear communication with municipal and county staff, and practical problem solving for landowners. Our team has handled matters involving lot splits, boundary adjustments, dedication and vacation of easements, and coordination with surveyors and civil engineers. With a track record of guiding clients through local approval processes, the firm emphasizes efficient workflows and documentation that align with City of Brentwood and Williamson County expectations.
Understanding Subdivision and Platting Procedures
Subdivision and platting refers to dividing land into separate lots and preparing formal plats for submission to local authorities and recording with the county. The process involves survey work, compliance with zoning and subdivision regulations, and collaboration with city planning and public works departments to address access, utilities, and drainage. Requirements vary by jurisdiction; in Brentwood, careful attention to approved street layouts, lot dimensions, and public improvements can determine whether a plat is acceptable. Landowners should plan for multiple review cycles and coordinate closely with surveyors and engineers to meet technical standards before final recording.
A plat is a recorded map of property that establishes legal boundaries, easements, and public dedications. Preparing a plat often requires staged approvals including preliminary review, engineering sign-off, and final plat acceptance. In many cases, sureties, performance bonds, or construction of improvements are required prior to or concurrent with final plat approval. Understanding these stages allows property owners to schedule financing, construction, and sales efforts more predictably. Knowing the typical municipal checklist in Brentwood, such as slope limitations, buffer requirements, and drainage plans, helps reduce unexpected revisions.
What a Plat Is and How It Functions Legally
A plat is a legal document that lays out parcel boundaries, rights-of-way, easements, and any public dedications. Once approved and recorded, it becomes part of the public record and governs legal descriptions used in deeds and conveyances. Plats may also show building setback lines, floodplain boundaries, and utility placements. Preparing an accurate plat requires field surveys and coordination with municipal standards so that property descriptions match physical monuments and legal requirements. For developers and landowners in Brentwood, a professionally prepared plat helps ensure clear title, appropriate access, and documented rights for utilities and maintenance.
Key Elements and Steps in the Subdivision and Platting Process
Key elements include a boundary survey, topographic information, proposed lot layout, easement identification, and infrastructure plans for roads, drainage, and utilities. The process begins with pre-application meetings in many municipalities, then moves to preliminary plat review where staff comment on technical issues. Engineers and surveyors address those comments and prepare construction documents as needed. After fulfilling conditions, applicants submit a final plat for formal approval and recording with Williamson County. Attention to each step and clear documentation of required easements and dedications reduces delays and supports a smooth transition from concept to recorded lots.
Key Terms and Glossary for Subdivision and Platting
Familiarity with common terms used in subdivision and platting helps property owners communicate effectively with planners and consultants. This brief glossary explains frequently encountered words and concepts so you can review staff comments and engineering reports with confidence. Understanding these definitions helps identify obligations tied to a plat, such as required public improvements, easement rights, and recording requirements. When in doubt, refer to the municipal code or consult with a lawyer to confirm how a specific term is applied in Brentwood and Williamson County.
Plat
A plat is a mapped depiction of land prepared by a licensed surveyor that shows lot lines, easements, rights-of-way, and other features. Once accepted by the appropriate local authority and recorded, a plat provides the official legal descriptions used in deeds and transfers. A properly prepared plat aligns with physical monuments in the field, local subdivision regulations, and any conditions imposed during review. For owners and developers, the recorded plat is the definitive reference for lot boundaries, required public improvements, and access provisions.
Easement
An easement is a legal right that permits a person or entity to use a portion of another’s property for a specific purpose, such as utilities, access, or drainage. Easements are commonly shown on plats to ensure public or private utilities can be installed and maintained, or to specify shared driveways and access corridors. When a plat dedicates an easement, it binds future owners to that right. Understanding the location, width, and purpose of easements on a plat is essential to avoid conflicts and to plan construction or landscaping appropriately.
Preliminary Plat
A preliminary plat is an initial submission that outlines the proposed division of land and the layout of lots, roads, and utility corridors for review by planning staff. It is not final but is used to identify compliance issues, required improvements, and potential modifications. Staff review of a preliminary plat often results in conditions that applicants must address prior to final approval. Preparing a thorough preliminary plat, with accurate surveys and preliminary engineering work, helps reduce the number of review cycles and provides a clearer path toward final plat acceptance.
Final Plat
The final plat is the document submitted for official approval and recording after preliminary conditions have been met. It contains detailed survey information, certified statements, and any required notes regarding access, easements, and dedications. Upon acceptance, the final plat is recorded with the county register of deeds and becomes the official public record. Recording the final plat completes the subdivision process from a legal standpoint and allows lots to be sold or otherwise conveyed using the recorded descriptions.
Comparing Limited and Comprehensive Approaches to Subdivision Matters
When approaching a subdivision project, property owners may choose a limited engagement to address a single need like a boundary line adjustment, or a broader approach that covers comprehensive planning, coordination, and documentation. A limited approach may suffice for straightforward matters with minimal approval steps, while a comprehensive approach helps manage larger developments, utility coordination, and long-term compliance. Weighing the scope of work, potential municipal conditions, and the need for engineering design will guide which approach best reduces risk and aligns with project timelines in Brentwood and Williamson County.
When a Targeted Legal Approach Is Appropriate:
Boundary Line Adjustments and Simple Lot Splits
A limited approach is often sufficient for boundary line adjustments or simple lot splits that do not require extensive public improvements or new road construction. If the proposed change fits within existing zoning and infrastructure constraints, and municipal staff indicate a streamlined review, focused legal assistance can efficiently prepare necessary documents, coordinate with the surveyor, and ensure proper recording. This route can be more cost-effective when technical complexity is low and when the municipality does not require multiple engineering approvals.
Minor Record Corrections or Plat Revisions
When the issue involves correcting recording errors, updating minor plat notes, or clarifying an existing easement, a limited engagement may address the matter promptly. These tasks typically require precise survey information, clear drafting of corrective instruments, and communication with county records staff. A targeted approach reduces time spent on broader strategic planning and focuses on the documents and approvals needed to resolve the specific recording or clarity issue at hand.
When a Comprehensive Strategy Is Advisable:
Large-Scale Developments and Infrastructure Coordination
Comprehensive legal support becomes important for larger projects that involve multiple lots, new roads, or coordinated utility extensions. These matters require early and ongoing coordination with engineers, planners, and public works departments to meet design standards and secure phased approvals. Addressing title matters, drafting dedication or maintenance agreements, and planning for subdivision bonds or sureties generally benefits from a comprehensive approach that integrates permitting, financing considerations, and long-term covenant drafting to protect the project through final acceptance and recording.
Complex Title or Access Issues
When title defects, overlapping easements, or disputed access rights are present, a comprehensive approach helps identify and resolve potential legal barriers before costly construction begins. Addressing these matters may involve quiet title work, negotiating easement modifications, or drafting agreements to align recorded interests with the physical reality on the ground. Early resolution reduces the risk of litigation and facilitates smoother municipal approvals and financing for the project.
Benefits of Taking a Comprehensive Approach to Subdivision Planning
A comprehensive approach to subdivision planning improves predictability by identifying regulatory obstacles and design requirements early in the process. Coordinated planning with engineers and city staff helps reduce the number of revisions and speeds final acceptance. Addressing title matters, easement conflicts, and required dedications proactively minimizes delays during review cycles. Overall, integrated legal planning supports more reliable scheduling for construction, lot sales, and financing events tied to the project timeline.
Comprehensive planning also helps protect long-term interests by documenting maintenance responsibilities, access rights, and homeowners association obligations when applicable. Drafting clear covenants and agreements at the outset prevents misunderstandings among future owners and eases municipal interactions when public improvements are completed. This thoughtful approach supports marketability of newly created lots and reduces the chance of post-recording disputes that can be costly and time consuming to resolve in Williamson County.
Improved Approval Efficiency
Planning comprehensively often reduces the number of review cycles with municipal staff, because many technical issues are addressed before formal submission. Coordinating survey, engineering, and legal reviews in advance makes preliminary plat submissions more complete and easier for planning commissions to accept. This approach tends to produce clearer comment responses and fewer surprises at the final plat stage, helping projects maintain momentum and stay closer to anticipated schedules for recording and development milestones.
Stronger Long-Term Documentation and Risk Management
A comprehensive approach ensures that easements, dedications, and maintenance obligations are clearly documented in recorded instruments. By anticipating future ownership transfers and infrastructure responsibilities, clients reduce the likelihood of boundary disputes and unclear duties. Clear documentation supports marketability and lender confidence when lots are financed or sold, and it simplifies resolution of issues that might otherwise lead to litigation or administrative delay in Williamson County or the City of Brentwood.

Practice Areas
Real Estate Services
Top Searched Keywords
- Brentwood platting regulations
- Williamson County subdivision process
- boundary survey Brentwood
- final plat recording
- easement drafting Tennessee
- lot split Brentwood TN
- municipal planning Brentwood
- subdivision approval timeline
- public dedication requirements
Practical Tips for Subdivision and Platting in Brentwood
Start with a Pre-Application Meeting
Scheduling a pre-application or informal meeting with city planning staff and your surveyor can reveal municipal expectations early and identify potential issues that might otherwise lead to rework. Use this meeting to confirm required studies, typical approval timelines, and any local design preferences that could impact road alignment or lot configuration. Early feedback from planners and engineers helps you create a preliminary plat that addresses key concerns so that formal submission proceeds more smoothly and avoids multiple revision cycles.
Coordinate Survey and Engineering Early
Address Title and Easement Matters Before Submission
Resolving title exceptions, clarifying recorded easements, and documenting access rights early prevents last-minute complications during plat approval and recording. Understanding who holds rights to use a parcel, where utility lines are located, and whether any prior dedications exist enables the drafting of clear plat notes and corrective instruments as necessary. This preventive work reduces the chance of delays at final plat stage and helps ensure that recorded lots are marketable and usable under the intended design.
Why Property Owners in Brentwood Consider Subdivision and Platting Assistance
Property owners pursue subdivision and platting assistance to ensure compliance with local codes, secure clear legal descriptions, and align development plans with municipal expectations. Assistance can help identify necessary public improvements, required easements, and conditions for final acceptance. For owners planning to sell or finance newly created lots, having a recorded final plat and well-documented access and utility arrangements streamlines transactions and provides clarity for buyers and lenders. Professional guidance at an early stage reduces the risk of costly rework.
Another reason to engage legal and planning support is to manage relationships with city staff and neighboring property owners. Coordinating dedications, temporary easements, or maintenance agreements often involves negotiation and documentation that benefits from careful drafting. If title issues arise or if previous records conflict with existing conditions, addressing those matters before submitting a plat is more efficient and helps avoid extended review or recording delays. Practical planning improves the chance of a timely approval and a clean recorded outcome.
Common Situations That Trigger Subdivision and Platting Work
Common triggers include plans to divide a single parcel into multiple lots for sale, separating land for family transfers, correcting recorded boundaries, or enacting a planned development requiring new lot lines. Developers also require platting to formalize lot layout prior to constructing roads and utilities. Other circumstances include consolidations, vacation of easements, and legal clarifications when title or access rights are unclear. Each situation brings distinct documentation needs and municipal review requirements to address before final recording.
Creating Lots for Sale or Development
When a landowner plans to create lots for sale or construction, platting is required to define legal lot lines, access points, and utility connections. This process typically involves survey work, preliminary design, and coordination with the city for road and drainage requirements. Planning ahead for these elements helps establish realistic timelines for subdivision approval and construction activities and supports financing and marketing efforts once lots are ready to convey.
Resolving Boundary Disputes or Conveyance Issues
Boundary disputes, ambiguous deeds, or historical surveying errors may necessitate a plat or corrective instrument to clarify ownership lines and facilitate conveyances. Preparing an accurate plat with a modern survey and consistent legal descriptions resolves uncertainty and provides a recorded reference that futurs parties can rely on. This corrective action helps avoid litigation and streamlines subsequent transactions or development activities.
Updating Plats for Infrastructure or Easement Changes
Changes in utility alignments, roadway improvements, or drainage needs sometimes require updated plats or easement adjustments to reflect current conditions. When public or private infrastructure alters how land is used, recording an amended plat or documenting new easements ensures that maintenance responsibilities and rights are clear. Proactively addressing such updates prevents conflicts with municipal authorities or neighboring properties during later development stages.
Local Assistance for Subdivision and Platting in Brentwood
Jay Johnson Law Firm offers practical assistance for clients facing subdivision and platting matters in Brentwood and Williamson County. We help prepare and review plat documents, coordinate with surveyors and engineers, respond to municipal comments, and prepare recording instruments that reflect negotiated easements and dedications. Our approach focuses on clear communication and timely follow-through so property owners understand each step of the municipal approval and recording process and can plan development and transactions with greater certainty.
Why Choose Jay Johnson Law Firm for Subdivision Matters in Brentwood
Clients rely on the firm for careful preparation of plat-related documents and for steady coordination with municipal staff and consultants. We prioritize review of title matters, drafting of plat notes, and communication with surveyors to align the recorded instruments with physical conditions and project goals. Our goal is to reduce surprises and to present municipal reviewers with a clear, technically supported submission that addresses common comment areas early in the process.
The firm assists with negotiation and drafting of easement agreements, dedications, and maintenance responsibilities that often accompany subdivisions. Clear drafting at the outset helps avoid future disputes and clarifies rights and duties for owners and service providers. We also help structure documentation to support financing and conveyances once lots are ready for sale, ensuring the recorded plat and related instruments meet lender requirements and municipal expectations.
For property owners concerned about timelines and cost, early planning and coordinated submissions typically save time and reduce the need for repeated corrections. We work with local surveyors, engineers, and city staff to develop practical plans for approval and recording, and we help clients understand the implications of municipal conditions and bonding requirements so they can make informed decisions about next steps.
Start Your Platting Project with a Consultation
How We Handle Subdivision and Platting Projects
Our process begins with an initial review of title, zoning, and existing recorded instruments for the subject property. We then coordinate with surveyors and engineers to assemble the technical materials needed for a pre-application discussion or preliminary plat submission. Following municipal feedback, we assist in drafting or revising plat notes, easement instruments, and any required agreements, and we manage communications with city staff through final approval and recording. This structured approach aims to keep projects moving efficiently from concept to recorded lots.
Step One: Initial Review and Project Setup
In the initial phase we review title records, local zoning and subdivision ordinances, and any prior plats that affect the property. This review identifies potential constraints such as recorded easements, floodplain areas, and existing rights-of-way. We meet with surveyors and engineers to confirm the scope of the technical work and to establish a timeline for preliminary submission. Identifying these matters up front allows the team to prepare a more complete application and to anticipate municipal concerns that could affect approval.
Title and Records Review
A careful title and records review detects exceptions, historical dedications, or ambiguities that could affect the ability to create new lots. Establishing who holds easement rights and whether prior dedications are recorded helps determine whether corrective documents or negotiations are necessary. This review informs drafting of plat notes and any required conveyances so that proposed lot lines are consistent with recorded legal rights and obligations.
Coordination with Technical Consultants
We coordinate with licensed surveyors and civil engineers to ensure required field work, topographic data, and preliminary infrastructure plans are completed to municipal specifications. Early technical coordination reduces later surprises and streamlines staff review. By aligning legal drafting with technical designs, the submission package presents a coherent plan that addresses common municipal checklist items and supports a smoother path to preliminary acceptance.
Step Two: Submission and Municipal Review
During submission and review we present the preliminary plat and supporting documents to city planning departments for comment. This stage often involves multiple rounds of staff feedback focused on lot design, drainage, utility connections, and access. We assist in preparing responses to comments, revising plat documents, and documenting any proposed easement language or dedications needed to satisfy municipal requirements. Active engagement with staff at this stage helps shape final conditions for acceptance.
Responding to Staff Comments
We prepare clear, document-based responses that explain how survey and engineering revisions address municipal concerns. This may include revised drawings, updated drainage analysis, or corrected plat notes. Providing comprehensive responses helps avoid repetitive questions and signals that the submission is ready for final consideration. Coordinated responses between legal, survey, and engineering teams are particularly effective in resolving technical and legal review items efficiently.
Negotiating Conditions and Agreements
When municipalities require dedications, performance guarantees, or maintenance agreements, we assist in drafting and negotiating those documents to align with project needs and municipal standards. This may include preparing plat notes that reflect agreed terms or drafting separate agreements to be recorded concurrently with the final plat. Clear, well-drafted documents reduce ambiguity and facilitate final approval and recording.
Step Three: Final Approval and Recording
At final plat stage we ensure all conditions are satisfied, required signatures are obtained, and any necessary bonds or guarantees are in place. We prepare the final recording package and coordinate with the county register to record the plat and related instruments. Once recorded, the lots have official legal descriptions for conveyance and development. Prompt and accurate recording concludes the municipal approval process and enables subsequent financing or sale activities.
Preparing Recording Documents
We assemble final signed plats, any easement or dedication documents, notarizations, and recording fee information to submit to the Williamson County Register of Deeds. Ensuring that each document meets recording office requirements prevents rejections that cause delays. Proper recording also updates public records so purchasers and lenders can rely on the current legal status of the lots.
Post-Recording Follow-Up
After recording, we confirm that all documents are indexed correctly and provide clients with copies for closing and financing needs. We also advise on any subsequent steps such as filing homeowner association covenants or handling minor corrections if required. This follow-up helps ensure the recorded outcome supports planned sales, construction, and long-term property management.
Frequently Asked Questions About Subdivision and Platting in Brentwood
What is the typical timeline for subdivision and plat approval in Brentwood?
Timelines for subdivision and plat approval vary depending on project complexity, municipal workload, and whether required infrastructure or studies are needed. A simple lot split that meets zoning and does not require new public improvements may be processed more quickly, while larger developments with road, drainage, or utility work can require multiple review cycles and construction commitments. It is common for the preliminary review stage to take several weeks to a few months, and the final approval and recording process may require additional months if improvements or bonds are needed.Planning ahead and coordinating with surveyors and engineers can shorten the process by producing a more complete submittal. Engaging in pre-application discussions with Brentwood planning staff helps identify likely concerns and required studies so that the formal application addresses major issues from the outset. Clear documentation and timely responses to staff comments are the most effective ways to keep a project on track toward approval and recording.
Do I need a survey before applying for a preliminary plat?
Yes, a recent boundary and topographic survey is typically required before applying for a preliminary plat. Accurate survey data ensures proposed lot lines align with existing physical monuments and recorded descriptions, and it provides the elevation and feature information engineers need to design drainage and utility layouts. Municipalities generally expect professional surveys prepared by licensed surveyors to support the technical aspects of the plat and to reduce discrepancies during review.Coordinating the survey with preliminary engineering reduces the need for later adjustments. When surveys and engineering plans are prepared together, the preliminary plat will more accurately reflect feasible lot configurations and infrastructure routing, making the review process more efficient and reducing the risk of multiple revision cycles.
How are easements shown and treated on a plat?
Easements are typically shown on plats with specific labels indicating their purpose, width, and the party benefitting from or responsible for the easement. Common easement types include utility easements, drainage easements, and access easements. Once shown and recorded, easements become part of the public record and bind future owners, so clarity in their description and location is important to avoid conflicts.If existing easements are unclear or if new easements are required, plat notes or separate recorded agreements should define responsibilities and maintenance terms. Addressing easement language during the platting process prevents disputes and ensures utility providers and municipal departments can perform necessary work without ambiguity.
What happens if staff requires road improvements as a condition?
If staff requires road improvements as a condition of plat approval, property owners typically have options such as constructing the improvements before final approval, providing a performance bond or surety to guarantee completion, or agreeing to phased acceptance under municipal rules. The specific approach depends on municipal policy, the scope of required work, and the project schedule. Understanding those options early helps align financing and construction plans with approval requirements.When improvements are deferred under a bond, clear documentation about timelines, inspection requirements, and responsibilities helps ensure eventual municipal acceptance. Coordinating with engineers and contractors on cost estimates and schedules provides the information necessary to decide the best path forward for both compliance and project feasibility.
Can I record a final plat if there are outstanding title exceptions?
Outstanding title exceptions can prevent final plat recording if they affect the ability to create clear legal descriptions or if they conflict with proposed lot lines or easements. Situations such as unresolved ownership claims, ambiguous deeds, or unrecorded rights may need corrective instruments or quiet title steps before recording. Addressing these matters early during title review reduces the chance of rejection at the final stage.In some cases, title companies will issue exceptions that require resolution through corrective documents or agreements prior to closing. Working with title professionals and drafting appropriate recorded instruments ensures that the final plat can be accepted and relied upon by buyers and lenders without lingering title concerns.
How do performance bonds or sureties work for required improvements?
Performance bonds or sureties serve as financial guarantees that required public improvements will be completed according to municipal standards. When construction cannot be finished prior to final plat recording, local governments often accept a bond in an amount sufficient to cover completion costs, along with a schedule and inspection plan. The municipality retains oversight until the improvements are inspected and accepted, at which point the bond may be released.Deciding whether to post a bond or complete work upfront involves weighing cash flow, construction scheduling, and municipal terms. Proper documentation and coordination with municipal inspectors and engineers help ensure bond conditions are met and improvements are accepted on schedule.
Will a plat affect my property taxes or assessable value?
Recording a plat can change how property is described for assessment purposes, but it does not automatically change the tax classification or rate. Creating new lots may affect assessed values if development or new uses increase property value, and local assessors may update records based on the recorded plat and subsequent sales or improvements. Property owners should be prepared for potential reassessment once lots are developed or sold.Owners concerned about tax implications can consult with the county assessor or a tax professional to understand how subdivision and subsequent development may affect assessments. Clear documentation of the recorded plat and any dedications or easements supports accurate assessment and can help address questions from local authorities.
How do I handle a boundary dispute discovered during platting?
If a boundary dispute arises during the platting process, addressing it early is important to avoid delays. Resolving disputes may require a modern survey, reviewing historical records, and negotiating agreements with neighboring owners. When negotiation is not successful, parties may need to consider legal remedies to clarify title or resolve conflicting claims prior to final plat recording.Taking proactive steps such as obtaining a current boundary survey and consulting about potential corrective instruments helps focus discussions and often leads to amicable resolutions. Timely action reduces the risk that unresolved disputes will hold up approvals or complicate future transactions involving the property.
What are common reasons a plat might be rejected by planning staff?
Common reasons a plat might be rejected include failure to meet local zoning or subdivision standards, incomplete survey information, inadequate drainage plans, conflicts with recorded easements, or missing signatures and certifications. Technical errors in plans or omissions in required documentation often prompt staff to return a submission for correction rather than approve it. Addressing these areas before submission reduces the chance of rejection.Engaging in pre-application meetings and coordinating survey and engineering work with municipal checklists can significantly reduce common errors. Providing complete responses to staff comments and ensuring that all required instruments and certifications accompany the final submission improves the likelihood of acceptance and recording.
How should I prepare for meetings with city planners and engineers?
Prepare for meetings with city planners and engineers by bringing clear project objectives, existing deed and survey documents, and preliminary sketches of proposed lot layouts. It is helpful to have a licensed surveyor or engineer present to discuss technical constraints and to gather staff feedback about required studies, ordinance standards, and likely conditions. Taking detailed notes during these meetings helps plan the next steps and reduces misunderstandings.Also gather title information and any prior plats so staff can see historical documentation that may affect the project. Early, organized preparation and a collaborative attitude help make these meetings productive and provide clarity on municipal expectations for subsequent submissions.